This transport included the full requirements of professional project transports, due to the dimension of 8 Meters length and a DIA of 4,30 Meters / 86 Tons, TOL arranged a complete road survey from Eastern Germany up to Bremerhaven.
Road traffic management and de-installation of traffic lights and railway barriers was necessary.
The boiler was loaded on a Mafi Trailer and shipped to port Shanghai.
Austria
View Profile: Transport Overseas Logistics GmbH
View Website: http://to-logistics.com/
Germany
View Profile: Transport Overseas Logistics GmbH
View Website: http://to-logistics.com/
Switzerland
View Profile: Transport Overseas Logistics GmbH
View Website: http://to-logistics.com/
Poland
View Profile: Transport Overseas Logistics GmbH
View Website: http://to-logistics.com/